Repository navigation
docs: reconcile roadmap and release ledgers with v0.6.0 - #439
Merged
Merged
Conversation
Milestone 16 and the workflow visualizer shipped in v0.6.0, and the completion-driven ComfyUI ingestion package merged on dev. The roadmap still described v0.5.0, left the identity migration unchecked after R0-R6 closed, and presented the zero-latency pipeline as unimplemented. - Mark Milestone 16 complete and rewrite Milestone 17 around the three shipped packages plus the ingestion depth that remains. - Check the identity migration item and record the standing pre-1.0 compatibility obligation instead. - Point the installed-update gate at two consecutive signed releases (v0.5.2 -> v0.6.0), which makes #256 executable. - Note the wiring point for the remaining video facets. - Refresh the historical ledgers that still claimed migration implementation and release verification were pending. Refs #256 Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
The diagram still showed three planned milestones and a partial model-ecosystem track. Redraw it for fourteen complete milestones, video and ComfyUI studio in progress, and milestones 18-19 planned. The light variant is regenerated from the same geometry so the two themes stay identical apart from palette. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
- Record the published v0.6.0 installer sizes next to the retained v0.5.2 baselines, since the publication gate compares against both. - Point the release guide at v0.6.0 as the latest published release and use it in the tag example instead of v0.5.0. - Update the release-note preview example to the current version. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Documentation-only change. Several status pages still described v0.5.0, treated the identity migration as unimplemented after R0–R6 closed, and presented the ComfyUI ingestion packages as unstarted. No code, schema, config or IPC changed.
Roadmap status
dev, with the remaining ingestion depth named explicitly: remote output transfer, reconnect history replay, video/custom-node descriptors, move pipelines and cleanup, queue-worker isolation.width,heightandvideo_codecare already extracted.Historical ledgers
OMERA_MIGRATION.md,OMERA_RENAME_STATUS.md,TASK_ASSIGNMENT_BOARD.md,DELIVERY_ROADMAP.mdandSTABILIZATION_EXECUTION.mdnow state what is actually true: the migration services exist inlegacy_migration.rs, #134 is closed, every issue the task board lists is resolved, and #256 is the only open release gate.Release documentation
PERFORMANCE.mdrecords the published v0.6.0 installer sizes (17.10 MiB EXE, 33.56 MiB MSI, 18.34 MiB DMG, 32.34 MiB DEB/RPM, 100.96 MiB AppImage) alongside the retained v0.5.2 baselines that the publication gate compares against.RELEASING.mdandRELEASE_NOTES.mduse v0.6.0 in their command examples.MULTI_DATABASE_COLLABORATION_RFC.mdno longer advertises av0.4.0+target for a backend that remains deferred.Diagram
docs/screenshots/roadmap_status_{dark,light}.svgare redrawn for fourteen complete milestones, video and ComfyUI studio in progress, and milestones 18–19 planned. Both files are well-formed XML and share identical geometry; the light variant is regenerated from the dark one so the themes cannot drift.Verification
node scripts/generate-release-notes.mjs --checkpasses.README.mdanddocs/*.mdresolve.git diff --checkis clean.Documentation only: no build, frontend or Rust suite was required, and no release or publication state was touched.
🤖 Generated with Claude Code